Region No. |
Flood Area |
High Water Level in Channels |
State of Sluice/outfall |
Comments |
2 |
No report of flooding.
|
Reports of accumulation in low areas of Better, Success/Andrews. |
Ok. |
- All Sluices/Pumps are operable.
- Construction of drainage sluice at Westbury is in progress.
- Remedial works to Charity sluice are in progress. Sluice is operable.
- One door at Iterbisi Conservancy is opened.
- High waters are receding. |
3 |
Report of flooding in low areas canal no. 1 & 2. |
Reports of high waters in Canal No. 1 and 2, Vergeogen, Parika Backdam.
|
Ok. |
- All Sluices/Pumps are operable.
- Pulling of Hammer is ongoing to remove vegetation (moss) in canal No. 1 and No. 2 is on going.
- Cleaning of drains in Bell West in progress.
- Cleaning of sluice outlets at Pouderyne to enhance drainage will commence shortly.
- High and flood water are receding.
|
4 |
No report of flooding |
Reports of high water level in channels at Greenfield, Friendship/Craig areas. |
Excavation of outfall channel at: Belfield to commence shortly. |
- All fixed and mobile pumps are operable.
- Jet pump will be deployed to Hope clear outfall channel.
- Mobile pump installed at Supply Mahaica and is operable.
- Cleaning of drains in Unity/Vreegening is in progress.
- High waters are receding.
|
5 |
No Report of flooding
|
No report of high waters. |
Ok |
- All Sluices/Pumps are operable.
- Cleaning of Wash Clothes canal in progress.
- NDIA excavators are currently working within the Mahaica/Mahaicony area. |
6 |
Report of minor flooding in Alness Residential area. |
No Reports of High waters in No. 19, 52/74 & Alness. |
Ok. |
- Remedial works is being carried out on sluice door at Moleson Creek.
- RDC Region No. 6 to undertake cleaning of drainage outlets in Alness today.
- Cleaning of internal drains within the housing area of Alness commences today.
- Manual cleaning of 52/74 Façade Canal in progress. |
10 |
No report of flooding. |
No Report of High waters in Block 22, Lower Kara Kara, Nottinghampshire West Watooka. |
Ok. |
- 24 contracts have been awarded to CDC groups to undertake maintenance. These works are in progress. |
GEORGETOWN |
-
|
Reports of minor flooding in low areas of Sophia, Cummings Lodge and Industry. |
Reports of accumulation of water in low areas of Sophia, Cummings Lodge and Industry.. |
Ok. |
-NDIA Mobile pumps at Kitty and Liliendaal are operable.
- One electrical pump at Kitty pump is operable.
- City Engineer’s department reported that drainage pumps at River view and Kingston is presently being repaired and will be completed shortly.
- High and flood waters continue to recede. |